Tecnico Site Services
Contractors in Hutt
www.tecnico.co.nz/
Address
230 Muritai Road. Eastbourne.. Hutt, Wellington.Are you the owner or manager of this company?
What you should know about Tecnico Site Services
The smaller beacons were all solar powered but the main lights with 100 watt lamps and 2 tons of rotating lens needed too much power for effective solarisation. A 50w lamp was capable of achieving almost the same range as the old 100W incandescent lamps. The island was powered by diesel generators giving only 10 hours power per day and with the cost of getting diesel to the island this was a very expensive option. Developments in optics and lamp technology made it possible to reduce power consumption to levels where solarisation became feasible.
A 50w lamp was capable of achieving almost the same range as the old 100W incandescent lamps. A combined solar and wind installation with battery back up was designed to make the optimum use of both the wind and solar profiles throughout the year along with developing energy efficiency initiatives. Electric appliances are now being used when there is surplus energy further reducing the requirement for bottled gas. The installation has reduced the diesel generator usage to the minimum required for monthly maintenance with the generator often not being required for months. The devices selected had to be effective and reliable providing the most power to the residents in these remote locations.
The remote locations use costly diesel generators so require a cost effective power solution. Depending on the energy requirements of the dwelling either a Proven Kingspan 2. The turbine systems are backed up by a diesel generator and battery storage system to ensure continuous reliable power. The installation of the Proven Kingspan wind turbines on the Falkland Islands has provided green, reliable, cost effective power. 5 has the ability to produce between 2,500kwh and 5,00kwh annually and Proven Kingspan 6 has the potential to produce between 6,00kwh to 12,00 annually.
The distinctive blade design of the Proven Kingspan enables the turbine to produce electricity in both low and high winds providing maximum electricity output
Reviews of Tecnico Site Services (0)